項目管理學essay代寫范文——悉尼歌劇院項目管理分析,本文是一篇留學生管理專業的Essay寫作格式參考范文,悉尼歌劇院一直被譽為20世紀世界范圍內的建筑杰作,也是全國和全球的標志性地標(DEE, 2016;聯合國教科文組織,2006年)。然而,這座杰作背后的建設項目過程卻是一言難盡。本文旨在探討項目管理評價中的三重約束。本文將以悉尼歌劇院項目管理過程為例,采用傳統的三重約束,包括成本、時間和范圍。項目成功和項目管理成功之間的區別也將被討論。此外,還將分析其他可能影響項目管理成功的變量。以下是管理學essay范例寫作的全部內容,是一篇符合國外大學Essay寫作格式要求的范文,供參考。
Introduction引言
The Sydney Opera House has been knowing as the architectural masterpiece in the worldwide of the twentieth century and also an iconic landmark nationally and globally (DEE, 2016; Unesco, 2006). However, the construction project process behind the masterpiece building is a long story. The purpose of this essay is to investigate the triple constraints in the project management evaluation. The Sydney Opera House project management process will be examined as an example by using traditional triple constraints which include cost, time and scope. The distinction between project success and project management success will also be discussed. Further, other variables that may impact project management success will also be analyzed.
Project sucess and triple constraint項目成功和三重約束
Triple constraints refer to the list of primary requirements in the project management process which includes project scope, time and costs management. These three factors are also used to measure project management success(Brewer and Dittman 2010, p. 14 as cited in Cuellar, M. ,2010). Project scope is discussed as the main component which can drive the time and cost of the project management(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S. ,2013).
Scope 范圍
A welled defined project scope investigation will break the whole project into smaller pieces which can be easily managed(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S. ,2013).The project scope analysis will allow further investigation regarding the time frames and project budget changes during the project development process (Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S. ,2013). According to the research literature, most of the project scope was not well identified at the beginning of the IT projects and the most arguable reason is that the business domain was not well acknowledged(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S. ,2013). Other researchers argue that clients should take part of the responsibility for the poorly defined project scope as they may not provide cleary describe functionality in the project initiation stage (Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S. ,2013).
一個明確定義的項目范圍調查將把整個項目分解成易于管理的小塊(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S., 2013)。項目范圍分析將允許進一步調查項目開發過程中的時間框架和項目預算變化(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S., 2013)。根據研究文獻,大多數項目范圍在IT項目開始時沒有很好地確定,最有爭議的原因是業務領域沒有得到很好的認可(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S., 2013)。其他研究人員認為,客戶應該為定義不佳的項目范圍承擔部分責任,因為他們可能無法在項目啟動階段提供清晰的功能描述(Aminzadeh, M., Mojaveri, H. S., & Shafeiha, S., 2013)。
Capturing Scope 捕捉范圍
The scope is an important part of the product implementation strategy and the project management efficiency can be increased if the project scope was reached( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). There are a few steps for identifying the project scope( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013).
Identify Requirement 確定需求
The project requirement should not change over time once it was determined and it will be hard to produce a product with moving target and changing goal( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). Therefore, it is important to focus on real needs and investment. The main reason which leads to the project failures includes incomplete requirements, moving target requirements and unclear project objects( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013).. Moreover, the welled documented project scope is also important to make project success ( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). Sydney opera house project management can be identified as failed on scope management as the project plan and project scope have never been finalized in the initial stage of the project. The design of Utzon was at a very schematic and rudimentary level, which meant uncertainty of scope and quality of the whole project. Not only did the project launch with no finalized plans to follow, but the client also changed the floor plan from two theaters to four shortly after construction began. Compounding the chaos that followed was the lack of a project manager.
一旦確定了項目需求,就不應該隨著時間的推移而改變,并且很難生產出目標移動和目標變化的產品(Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M.,2013)。因此,關注實際需求和投資是很重要的。導致項目失敗的主要原因包括需求不完整、目標需求移動和項目對象不明確(Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M.,2013)..此外,充分記錄的項目范圍對項目的成功也很重要(Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M.,2013)。悉尼歌劇院項目管理在項目初期沒有確定項目計劃和項目范圍,在項目范圍管理上是失敗的。伍重的設計處于非常初級的原理圖水平,這意味著整個項目的范圍和質量都不確定。項目不僅在沒有最終計劃的情況下啟動,而且在施工開始后不久,客戶還將平面圖從兩個劇院更改為四個。項目經理的缺乏加劇了隨后的混亂。
Identify Stakeholder 識別利益相關者
When writing project requirements, Stakeholders should be on the priority to focus. Users and customers should be considered as the essential part of the stakeholders so it is important to know the real needs of the stakeholders and satisfied them. The key stakeholders should be involved in the project scope defined process and their needs should be considered during the whole project development process( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013).
Robert W. Poole, Jr. & Peter Samuel [30] carried out through analysis of Boston’s Big Dig Megaproject along with other transportation projects. They observed that the major source of cost increases in mega-projects is project creep, adding unanticipated elements and unforeseen complexity( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013).
For making a project successful, keeping good communication with the stakeholder is important. The dissatisfaction will impact the project negatively. Larsen and Grey(2011) state that project managers can use the communication plan as a tool to manage information distribution appropriately and make communication effective. In the project management process of Sydney Opera House, there is no communication plan was set up or policy which helps the project manager to communicate with the stakeholders properly. According to Sykes, the communication between Utzon and the engineering firm OVE Arup& Partners are frustrated as Utzon was not willing to share his idea with his design as he has higher expectations on the solution. The design itself was facing problems and the lakeness of the communication make the project going slowly. Ulzon also refused to have a phone in his office which makes the communication harder. Utzon was accused of poor cooperation by the engineers and Utzon believes that the engineer team lack of consultation.
為了使項目成功,與項目干系人保持良好的溝通是很重要的。不滿意將對項目產生負面影響。Larsen和Grey(2011)指出,項目經理可以將溝通計劃作為一種工具,適當地管理信息分發,使溝通有效。在悉尼歌劇院的項目管理過程中,沒有建立溝通計劃或政策,這有助于項目經理與干系人進行正確的溝通。據賽克斯說,伍重和工程公司OVE Arup& Partners之間的溝通是失敗的,因為伍重不愿意分享他的設計想法,因為他對解決方案有更高的期望。設計本身也面臨著問題,缺乏溝通使得項目進展緩慢。烏爾重還拒絕在他的辦公室里安裝電話,這使得溝通更加困難。伍重被工程師指責不配合,伍重認為工程師團隊缺乏咨詢。
Sydney Opera house project management was failed in stakeholder management because of the poor communication between Utzon and the engineering team. The main reason behind this is that Ulzon didn’t identify the engineer as an important stakeholder in the project and he barely take their advice seriously and make an effort to communicate with them.
Identify Project Drivers 識別項目的司機
Project results can be determined by outside factors which include regulation, laws, standard and other restrictions. The existing system, equipment, the software was usually set as the major driver by many companies, and security and safety were usually be considered as secondary concerns. All drivers are important for a project and the project manager should identify, track and analyze all of the drivers( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). The regulation and standard changes can be another reason for the scope of management failure in the Sydney Opera house case. The new local government was elected in 1965 and the constructing authority changed as well. Ulzon already agrees to demand with the previous government and this agreement was abandoned when the new government takes control. Ulzon failed to identify the drivers of the new government and The new minister accuse Ulzon of “providing confident assurances and then failing to meet the expectations” (Woolley, 2010, p. 15). (paper1)
Examining the Scope Statement 檢查范圍聲明
The scope statement can be explained as the tool to justify the project deliverables in high levels and project objective quantities (Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). According to the study of the Construction Industry Institute (CII), a welled defined scope will lead the project to success as it will help to save the budget by improving project predictability ( Mirza, M. N., Pourzolfaghar, Z., & Shahnazari, M. ,2013). However, it is impossible to exam the scope statement for Ulzon as the project scope keeps changing and even the project authority changed.
Time and budget 時間及預算
There is no set time frame in the Sydney opera house project which leads to the cost overruns. Time and costs were both important in the project management process and these two factors are related to each other. The project budget needs to be adjusted when the time was delayed to meet the quality requirement of a project. Sydney opera house project was not completed phase two in 1966 which is four years after the proposed completion date. Three Australian engineers take over the project after Utzon left and they complete phase two in 1967. When the project was finally completed in 1973, the project cost $102 million, almost fifteen times the plan budget.
悉尼歌劇院項目沒有固定的時間框架,導致成本超支。在項目管理過程中,時間和成本都很重要,這兩個因素是相互關聯的。為了滿足項目的質量要求,工期延遲時,需要調整項目預算。悉尼歌劇院項目的第二階段在1966年沒有完成,也就是在計劃完工日期后的四年。在伍重離開后,三名澳大利亞工程師接管了項目,并于1967年完成了第二階段。該項目最終于1973年完工,耗資1.02億美元,幾乎是計劃預算的15倍。
Project Success and Project Management Sucess項目成功和項目管理成功
One way to evaluate project management success is to define if the project objectives were achieved. Therefore, project management will be defined as successful if the project was finished on time and within budget. The project will be identified as success traditionally if it meets the requirements of the high-level management and the clients on cost, time, and scope performance (Larson and Gray 2011, p. 106 as cited in Cuellar, M. ,2010). Sydney Opera House can be defined as failed by using the traditional definition of project management success as the project failed on the finish on time, within budget and the scope requirements.
The definition of project success is more complicated than project management success. Baccarini(1999) states that Project success and project management success evaluation are two distinctive definitions. The project management process is more focused on the project management process itself and the triple constraints play an important role in it. On the other hand, Project success is more focused on the final deliveries or the accomplished works. Sydney Opera House was argued as a project-level success project but failed at the project management level completely( Nixon, Harrington, and Parker,2012). The project management level failed was because the project didn’t finish on the initial completion date and highly exceeded on cost. However, the questioning of the roles projects to time, quality, budget to define a project is increasing. Baccarini(1991) argues that project quality should be evaluated in a bigger picture of the project management process. Baccarini(1991) suggests that more factors should be considered when evaluating a project and the traditional triangle should be extended. Therefore, the Sydney Opera house project management should be evaluated by involving more affecting factors. In the product and project perspective, the project is successful at the product level. Sydney Opera House was known as the national landmark building and the building influenced the world both architecturally and culturally. The building has become the most popular cultural institution and attracts two million visitors.
3.0 Reflection and conclusion3.0反思與結論
Sydney Opera House is a typical case that failed on project management level and success on the project level. However, the traditional way to define project management success was questioned in today’s time management context. In her discourse “Avoiding the Successful Failure”, Bourne (2007) believes that there are other factors which can impact the project management other than triple constraintts.
The new technology makes time, cost and scope management more easily and makes the project management under control easily. The negative impact from the triple constrains can be prevented and reduced by the project management software. The project manager can easily track the project schedule and indicate the project performance. Most of the issues occrued on Sydney Opera House project management may no longer be an issue today. However, other factors can impact the project potentially like poor communication with the stakeholders, not a well-defined scope and unclear requirements.
新技術使時間、成本和范圍管理更加容易,使項目管理更加可控。三重約束的負面影響可以通過項目管理軟件來預防和減少。項目經理可以很容易地跟蹤項目進度和指示項目績效。悉尼歌劇院項目管理的大多數問題在今天可能不再是問題。然而,其他因素可能會影響項目,比如與涉眾溝通不暢,沒有定義明確的范圍和不明確的需求。